Please be advised of the changes in the schedule of the Submission and Opening of Bids for this project:

ACTIVITY PREVIOUS SCHEDULE REVISED SCHEDULE
Submission of Bids 3 July 2017

9 AM

17 July 2017

12 Noon

Opening of Bids 3 July 2017

11 AM

17 July 2017

2:30 PM

 

All terms, conditions and instructions to bidders specified in the Bidding Documents inconsistent with this Bid Bulletin are hereby superseded and modified accordingly.

 

Attached in this Supplemental Bid Bulletin is the route plan for La Union.

 

For a copy of the document click the link below:

Supplemental Bid Bulletin No. 1-DESIGN, SUPPLY, DELIVERY, INSTALLATION, SPLICING, TESTING, COMMISSIONING, OPERATION AND MAINTENANCE OF BRAND NEW FIBER OPTIC CABLE NETWORK IN LA UNION  

 

For information and guidance of all concerned.

 

Issued this 20th day of June 2017.

 

 

(Original Signed)

ALLAN S. CABANLONG

Chairperson, BAC4IGOV