The BAC4IGOV hereby decides to include, revise, amend, delete and/or adapt the following provisions:

Original Provision Amended Provision
SECTION VII-TECHNICAL SPECIFICATION
  1. Scope of Work
a.     As-build plans of all plans and drawings (network, route, termination, splicing, etc.) required by the project;

Micro-trenching ducts and appurtenances for the proposed project;

a.     As-build plans of all plans and drawings (network, route, termination, splicing, etc.) required by the project;

Micro-trenching and/or buried / conduit / directional boring ducts and appurtenances for the proposed project;

d.  Installation of underground microcable (for the backbone) and aerial fiber optic cable (for the distribution); d. Installation of underground micro-trenching method and/or buried / conduit / directional boring (for the backbone) and aerial fiber optic cable (for the distribution);
  1. TUGUEGARAO FOC NETWORK
1.2 Installation of 4-way HDPE microducts using microtrenching method approximately 15 km for the backbone cable routes. 1.2 Installation of 4-way HDPE microducts using microtrenching method and/or buried / conduit / directional boring approximately 15 km for the backbone cable routes.
  1. SAN FERNANDO PAMPANGA FOC NETWORK
2.2 Installation of 4-way HDPE microducts using microtrenching method approximately 10 km for the backbone cable routes. 2.2 Installation of 4-way HDPE microducts using microtrenching method and/or buried/conduit/directional boring approximately 10 km for the backbone cable routes.
  1. ILOILO CITY FOC NETWORK
3.2  Installation of 4-way HDPE microducts using microtrenching method of approximately 20 km for the backbone cable routes. 3.2 Installation of 4-way HDPE microducts using microtrenching method and/or buried / conduit/directional boring of approximately 20 km for the backbone cable routes.
  1. Preparation of Design Drawings
4.1.4  Geospatial data indicating the route plan, including the splicing point, termination point, and ODF. 4.1.4  Geospatial data using the ICTO-defined GIS application indicating the route plan, including the splicing point, termination point, and ODF.
DETAILED FINANCIAL BREAKDOWN (ANNEX VII-A)
Tuguegarao

(page 2/9)

No Stipulation Add as header the following items:

Item Qty Utilization Cost Total Utilization Cost
San Fernando, Pampanga

Page 3/9

ITEM QTY UNIT COST TOTAL COST PER ITEM
ITEM QTY UTILIZATION COST TOTAL UTILIZATION COST PER ITEM
Page 4/9
ITEM QTY UNIT COST TOTAL COST PER ITEM
ITEM QTY UTILIZATION COST TOTAL UTILIZATION COST PER ITEM

All terms, conditions and instructions to bidders specified in the Bidding Documents inconsistent with this Bid Bulletin are hereby superseded and modified accordingly.

Please use the Revised Technical Specifications, Revised Detailed Financial Breakdown (Revised Annex VII-A), and Revised Checklist attached in this Supplemental Bid Bulletin

To download this supplemental bid document, click on the link below:

Supplemental Bid Bulletin No. 2 – Design, Supply, Delivery, Installation, Splicing, Testing, Commissioning, Operation and Maintenance of Brand New Fiber Optic cable in Three (3) Regional Government Centers (Rebid)

For information and guidance of all concerned.

Issued this 3rd day of September 2015.

(SGD.) DENIS F. VILLORENTE
BAC4IGOV, Chairman