SPECIAL BIDS AND AWARDS COMMITTEE FOR THE INTEGRATED GOVERNMENT PHILIPPINES PROJECT (BAC4IGOV)
Supplemental Bid Bulletin No. 3
DESIGN, SUPPLY, DELIVERY, INSTALLATION, SPLICING, TESTING, COMMISSIONING, OPERATION AND MAINTENANCE OF BRAND NEW FIBER OPTIC CABLE NETWORK IN LA UNION
Bid Reference No. BAC4IGOV-2017-06-009
After considering the queries, clarifications, recommendations and suggestions, the BAC4IGOV hereby decides to include, revise, amend, delete and/or adapt the following provisions:
Original Provision | Amended Provision | ||
VIII. Bidding Forms
Detailed Financial Breakdown |
|||
ITEM | QTY | ITEM | QTY |
144 core, FOC, SM, 1310, Air blown or underground or buried fiber (depending on what type of fiber to be installed) 4km/drum |
3 drums
|
A. Design, Supply, Delivery, Installation, Splicing, Testing, Commissioning of Brand New Fiber Optic Cable Network in La Union | |
48 core, FOC, SM, 1310. Self-support (depending on what type of fiber to be installed), 4km/drum |
3 drums |
144 core Optical Fiber Cable | |
Patch Cord, LC/LC | 100 pcs | 48 core Optical Fiber Cable | |
Underground HDPE ducts/conduit/microducts, depends on the FOC supplied during installation | 1 lot | Route Survey | |
Other necessary materials | 1 lot | Underground installation of 4-way HDPE by microtrenching method and/or buried/conduit/directional boring) | |
FOC Maintenance for two (2) years (Contractor must have the necessary tools, equipment, vehicles and manpower to do the preventive maintenance and restoration activities in the duration of the contract.) | Underground installation of 144 core for Backbone Network (microtrenching method and/or buried/conduit/directional boring) and appurtenances for the proposed project | ||
Design, Supply, Delivery, Installation, Splicing, Testing, Commissioning of Brand New Fiber Optic Cable Network in Cotabato | Aerial or Underground installation of 48 core for Distribution Network or Fiber to the Building
(microtrenching method and/or buried/conduit/directional boring) and appurtenances for the proposed project |
||
144 core Optical Fiber Cable | Installation of Optical Distribution Frame (ODF)/Cabinet including patch cord/pig tails, optical fiber trays | ||
48 core Optical Fiber Cable | Termination of 144 cores FOC on PoP (Point of Presence) and 48 cores FOC on the client agencies/stations | ||
Route Survey | As-build plans of all plans and drawings (network, route, termination, splicing, etc.) required by the project | ||
Underground installation of 4-way HDPE by microtrenching method and/or buried/conduit/directional boring) of approximately 15 kms for the backbone cable routes | Splicing and termination of fiber optic cable | ||
Underground installation of 144 core for Backbone Network (microtrenching method and/or buried/conduit/directional boring) and appurtenances for the proposed project | Testing and commissioning (provisional and final acceptance) of newly installed FOC | ||
Aerial or Underground installation of 48 core for Distribution Network or Fiber to the Building
(microtrenching method and/or buried/conduit/directional boring) and appurtenances for the proposed project |
Restoration of all affected facilities. | ||
Design, Supply, Delivery, Installation, Splicing, Testing, Commissioning of Brand New Fiber Optic Cable Network in Cotabato | Permits | ||
Installation of Optical Distribution Frame (ODF)/Cabinet including patch cord/pig tails, optical fiber trays | B. Materials | ||
Termination of 144 cores FOC on PoP(Point of Presence) and 48 cores FOC on the client agencies/stations | 144 core, FOC, SM, 1310, Air blown or underground or buried fiber (depending on what type of fiber to be installed) 4km/drum |
3 drums
|
|
As-build plans of all plans and drawings (network, route, termination, splicing, etc.) required by the project | 48 core, FOC, SM, 1310. Self-support (depending on what type of fiber to be installed), 4km/drum |
3 drums |
|
Splicing and termination of fiber optic cable; | Patch Cord, LC/LC | 100 pcs | |
Testing and commissioning (provisional and final acceptance) of newly installed FOC; and | Underground HDPE ducts/ conduit/ microducts, depends on the FOC supplied during installation | 1 lot | |
Restoration of all affected facilities. | Other necessary materials | 1 lot | |
Permits | C. FOC Maintenance for two (2) years (Contractor must have the necessary tools, equipment, vehicles and manpower to do the preventive maintenance and restoration activities in the duration of the contract.) | ||
First Year Maintenance | 1 lot | ||
Second Year Maintenance | 1 lot |
All terms, conditions and instructions to bidders specified in the Bidding Documents inconsistent with this Bid Bulletin are hereby superseded and modified accordingly.
For information and guidance of all concerned.For a copy of the document click the link below:
Issued this 18th day of July 2017.
(Original Signed)
ALLAN S. CABANLONG
Chairperson, BAC4IGOV