Supplemental Bid Bulletin No. 7

SUPPLY, INSTALLATION, DETAILED DESIGN, TESTING AND COMMISSIONING, OPERATION AND MAINTENANCE SUPPORT OF IP MICROWAVE RADIO COMMUNICATION SYSTEM FOR DICT-PAGASA “ALL WEATHER COMMUNICATION SYSTEM PROGRAM”

Bid Reference No. DICTBAC-2019-017

Please be advised of the changes in the schedule of the Submission and Opening of Bids for this project:

ACTIVITY PREVIOUS SCHEDULE REVISED SCHEDULE
Submission of Bids October 1, 2019 12Noon October 2, 2019 12Noon
Opening of Bids October 1, 2019 1:30PM October 2,2019 1:30PM
ORIGINAL PROVISION AMENDED PROVISION
Section II. Instruction to Bidders
1.  Eligibility Documents – Class “A” Documents:   XXX

iv. Copy of each of the following Audited Financial Statements for 2017 and 2016 (in comparative format or separate reports):   (iv.1)   Independent Auditor’s Report; (iv.2)   Balance Sheet (Statement of Financial Position); and (iv.3)   Income Statement (Statement of Comprehensive Income)      
1.Eligibility Documents – Class “A” Documents:   XXX   iv.Copy of each of the following Audited Financial Statements for 2018 and 2017 (in comparative format or separate reports):   (iv.1) Independent Auditor’s Report; (iv.2) Balance Sheet (Statement of Financial Position); and (iv.3)Income Statement (Statement of Comprehensive Income)
SECTION III. BID DATA SHEET
ELIGIBILITY DOCUMENTS CLASS “A” DOCUMENTS 12.1    (a) ELIGIBILITY DOCUMENTS XXX iv. Copy of each of the following Audited Financial Statements for 2017 and 2016 (in comparative format or separate reports): a. Independent Auditor’s Report; b. Balance Sheet (Statement of Financial Position); and c. Income Statement (Statement of Comprehensive Income)          ELIGIBILITY DOCUMENTS CLASS “A” DOCUMENTS 12.1    (a)ELIGIBILITY DOCUMENTS XXX iv. Copy of each of the following Audited Financial Statements for 2018 and 2017 (in comparative format or separate reports): a. Independent Auditor’s Report; b.Balance Sheet (Statement of Financial Position); and c.Income Statement (Statement of Comprehensive Income)        
Section X. Checklist of Requirements
ENVELOPE 1: ELIGIBILITY AND TECHNICAL DOCUMENTS ELIGIBILITY DOCUMENTS CLASS “A” DOCUMENTS 12.1(a) ELIGIBILITY DOCUMENTS XXX iv. Copy of each of the following Audited Financial Statements for 2017 and 2016 (in comparative format or separate reports): a. Independent Auditor’s Report; b. Balance Sheet (Statement of Financial Position); and c. Income Statement (Statement of Comprehensive Income)        ENVELOPE 1: ELIGIBILITY AND TECHNICAL DOCUMENTS ELIGIBILITY DOCUMENTS CLASS “A” DOCUMENTS 12.1    (a)ELIGIBILITY DOCUMENTS XXX iv. Copy of each of the following Audited Financial Statements for 2018 and 2017 (in comparative format or separate reports): a. Independent Auditor’s Report; b.Balance Sheet (Statement of Financial Position); and c.Income Statement (Statement of Comprehensive Income)        
CLASS “B” DOCUMENTS (FOR JOINT VENTURE) 4.   Copy of each of the following Audited Financial Statements for 2017 and 2016 (in comparative form or separate reports): a.   Independent Auditor’s Report; b.   Balance Sheet (Statement of Financial Position); and c.    Income Statement (Statement of Comprehensive Income)   CLASS “B” DOCUMENTS (FOR JOINT VENTURE) 4.   Copy of each of the following Audited Financial Statements for 2018 and 2017 (in comparative form or separate reports): a.   Independent Auditor’s Report; b.   Balance Sheet (Statement of Financial Position); and c.    Income Statement (Statement of Comprehensive Income)  
For Joint Venture, the following documents must likewise be submitted by each partner:

xxx For item (ii) to (iv) of the required eligibility documents, submission by any of the Joint Venture partner constitutes compliance.
For Joint Venture, the following documents must likewise be submitted by each partner:
xxx
For Technical documents, submission by any of the Joint Venture partner constitutes compliance

All terms, conditions and instructions to bidders specified in the Bidding Documents inconsistent with this Bid Bulletin are hereby superseded and modified accordingly.

Please use the following forms attached in this Supplemental Bid Bulletin:

  • Revised Financial Breakdown as of 25th September 2019
  • Revised Checklist of Requirements as of 25th September 2019

For information and guidance of all concerned.For a full copy of the document, Click the link below:

Supplemental Bid Bulletin No.  7SUPPLY, INSTALLATION, DETAILED DESIGN, TESTING AND COMMISSIONING, OPERATION AND MAINTENANCE SUPPORT OF IP MICROWAVE RADIO COMMUNICATION SYSTEM FOR DICT-PAGASA “ALL WEATHER COMMUNICATION SYSTEM PROGRAM”


 [DHF1]Edit what SBB number

Issued this 25th day of September 2019.

(Original Signed)

IVIN RONALD D.M ALZONA Chairperson, DICTBAC